1.7 KiB
1.7 KiB
MVP1-12-OTC Milestone
History:
- 24.04.25: Initial Arch done in lucid by Waldemar
- 06.05.25: Ported to C4 by Stephan
- 13.05.25: Review OTC-EDP
Design links to lucid app
Roadmap Forgejo-as-a-Service
C4 Architecture
v